Originally posted by psmith
Is there a lot of construction going North to the East Crossing?
As of May 09, no construction through Mexicali on Calzada Gomez Morin to East Crossing, but mega construction on Hwy 5 about 20 miles north of San Felipe.
Rough dirt road detour, knocked the hell out of my trailer. |