Originally posted by BajaWarrior
We went to Gonzaga and stayed at Alfonsinas exactly one month ago. The new highway is being built at an impressive rate but the original road remains
past Huerfonito all the way to Gonzaga.
The paved section is still just about 6 miles or 1/2 mile past Campo Costillo.
From there the road parallels a bit in and out of the original road and there are also a lot of trucks delivering materials and heavy equipment moving
about as well. Definately no smoother than years past and we did it in a off road Toyota (2500lbs) with BFG KO's 33" aired down to 8 lbs.
Just take it easy and you'll do fine. The reason for what we might call delays is the amount of bridges that need to be built across the numerous
arroyos.
Have a great trip.
[Edited on 7-30-2009 by BajaWarrior] |