Originally posted by mcfez
On Friday, the long anticipated work to remodel the Malecon started. At present the contractor is tearing up the sidewalks on either side of the south
feeder road next to the Costa Azul Hotel. Traffic is still circulating normally but I expect that there will be periods during the next 2 months when
the new concrete sidewalks are poured and the road will be blocked as the work proceeds north. sfmex