Originally posted by capt. mike
know all about it. CFE is getting into solar BIG TIME. We have connections with a new panel mfgr set up brand new plant in Hermosillo. the La Paz
utility scale grid system is phased to become 10 megs of power. That's 10 million watts of generation. They are now into rebates, incentives etc like
USA. Grid tie is available. |