BajaNomad

Hwy 1 Border to Mulege 8-14 t0 8-16

BajaBill74 - 8-15-2018 at 06:29 PM


South of Ensenada and Manadero was heavy traffic and road needs resurfacing in many areas. When that happens, it will be chaos.

Six miles south of Santo Tomas as disused in another thread is MAJOR construction. I saw a large excavator 800 feet up a hillside with no possible of getting up there. Unbelievable.

I pulled into a line of 50 t0 75 vehicles and waited for 35 minutes. It's my guess that the first few had a one hour wait. This project is so humongous it will be around for a long time. (Maybe not longer than Hwy 5)

South of Catavino to BOLA was the best I've seen in over 5 years. Some bad spots on a scale of 1 to 10 a 3.

I was going to take a drone shot of the eagle at the border but chickend out. My wife said she wouldn't bail me out. :)