The Gringo Gazette said that the backlog is the result of one side of the La Paz pier being blocked by a broke down ship (ferry?). They said it is
backing up freight by 3 weeks and it will be at least a month before the ship is repaired. Cargo is being rerouted to Mexicali from the mainland and
then driven down south.
[Edited on 11-16-2022 by RFClark] |