CFE - Power to Property - Question
Hola All: I am posting for my brother. What is the current process for a CFE contract / power to a parcel? It has been so long for me. He has a parcel
Pescadero/Todos Santos area. Working on plans for small casita, will be fully permitted house.
So, has anyone recently gone through the process and what is needed?
Thanks Brian
|
|
4x4abc
Ultra Nomad
Posts: 4289
Registered: 4-24-2009
Location: La Paz, BCS
Member Is Offline
Mood: happy - always
|
|
from experience - it can take many many (many) months for the inspector to show up and approve the post you built (make sure you have all the specs
right) - after that it takes only a couple of months for the power to be connected. All in all it amounts easily to 6 months. Took me from September
to June.
Harald Pietschmann
|
|
BajaBlanca
Select Nomad
Posts: 13197
Registered: 10-28-2008
Location: La Bocana, BCS
Member Is Offline
|
|
But if you have a "connection", the time needed is drastically reduced.
|
|
4x4abc
Ultra Nomad
Posts: 4289
Registered: 4-24-2009
Location: La Paz, BCS
Member Is Offline
Mood: happy - always
|
|
that is so true.
Wanted to get a solar contract with CFE. Was told CFE does not grant contracts for tie in solar any longer (rather than the old analog meter running
backwards when you have overproduction, the new ones would count your input and credit your account).
I found someone who knows someone at CFE. Bingo! Contract and new meter within weeks.
Installation inspection was not easy to pass. Everything has to be super accurate. Thought I was in Germany.
Harald Pietschmann
|
|
elskel
Nomad
Posts: 449
Registered: 10-9-2006
Location: Laguna Beach & Pescadero BCS
Member Is Offline
|
|
Thanks for the replies. The parcel has underground wires pulled to the meter box (already constructed), he will share the box with his neighbor. The
neighbor, has house and power to it, from this meter box.
So, anyone recently build on a parcel? At what point were you able to get a contract and meter on the parcel? Also, what documentation was needed?
Thanks Brian
|
|
mojo_norte
Senior Nomad
Posts: 725
Registered: 2-14-2006
Member Is Offline
|
|
I would go to the local bill payer and discuss with them on what they charge to get a power contract - probably not that much. In my case the local
CFE field guy was dinking me around with various BS- "Underground wires are no longer allowed - The subdivision doesn't have enough transformers -
etc. " Finally , the builder who wanted power to start construction got the guy out there and said "how much?"
(As in bribe) - 500 pesos and the meter went in 2 days later
|
|
Bajazly
Super Nomad
Posts: 1013
Registered: 6-4-2015
Location: Goodbye Cali and Hello San Felipe
Member Is Offline
Mood: More Relaxed Everyday
|
|
I don't care what anybody says, that's a good deal right there.
Believing is religion - Knowing is science
Harald Pietschmann
"Get off the beaten path and memories, friends and new techniques are developed"
Bajazly, August 2019
|
|
Timo1
Senior Nomad
Posts: 743
Registered: 11-2-2007
Location: Homeless
Member Is Offline
Mood: Lovin every minute of it
|
|
I greased a couple palms and it took 3 days...Get to know your local lineman
sold out and got out !!!
|
|
BajaParrothead
Nomad
Posts: 460
Registered: 12-4-2012
Location: Portola, CA / Los Barriles
Member Is Offline
|
|
I had to wait until my escritura was recorded and then it was a couple of days in Los Barriles and the total cost was $500 pesos.
[Edited on 10-6-2019 by BajaParrothead]
|
|
BajaTed
Senior Nomad
Posts: 859
Registered: 5-2-2010
Location: Bajamar
Member Is Offline
|
|
Anything on the secondary load side is your design.
Es Todo Bueno
|
|
tiotomasbcs
Super Nomad
Posts: 1837
Registered: 7-30-2007
Location: El Pescadero
Member Is Offline
|
|
I think we got your guy here in Pesky..a few of us have used him recently. Have your brother come by my house. Next week is Fiesta Patrocinal in
Todos Santos. Open but hardly working!
|
|
elskel
Nomad
Posts: 449
Registered: 10-9-2006
Location: Laguna Beach & Pescadero BCS
Member Is Offline
|
|
Thanks for the responses, so basically the house needs to be finished to power up the parcel? Has anyone had CFE hookup during the construction
process?
brian
|
|
BajaUtah
Nomad
Posts: 190
Registered: 10-4-2013
Location: Salt Lake City/La Ribera
Member Is Offline
|
|
Part of our protocol in Lighthouse Point (just south of La Ribera) is to have water meters and power meters in place prior to any construction
beginning. I built a monument and installed the meter base using our contractor. I went to CFE in San Jose and paid the fees - I don't remember how
much, it was a while ago - and their guys came out and dropped the meter in place. As I recall there was not a lot of time between payment and meter
install.
This is inside an established development with underground power existing so I don't know if that makes a difference from your situation.
Andy
|
|